Skip to content

Build 843 Working Hardware Evidence Review

Field Value
Classification Controlled review of working/support evidence; not formal verification evidence
Subject JRC-FORMAL-VV
App BionicLoop 1.0 (843) / CC-DEV
Source walkabout-candidate-2026-08-21-build-843 / 1455cda7ad5d3e164b4a955ea0e3bc725a9996e9
Exercise window 2026-08-24 14:30 EDT through 2026-08-25 11:10:29 EDT
Review date 2026-08-27
Updated 2026-09-08
Sponsor status Supporting evidence accepted under D08; no separate formal hardware-validation claim

Purpose And Baseline Boundary

This review correlates the completed Build 843 formative real-device evaluation with the device-local recovery export, operator observations, and BionicScout records. It supports an impact and evidence-reuse decision for the intended IDE study build.

Build 843 is not the same configuration identity as engineering freeze ide-software-freeze-2026-08-21 at 91c0e98a9bc9429a0486bebdebffc7d8dbbe300e. Exact-freeze formal evidence remains governed by the 2026-08-21 Freeze Execution Report. This review did not itself designate Build 843 and does not promote working evidence to formal evidence; the separate designation was recorded on 2026-09-03 in Appendices A10C and A18.

Evidence Hierarchy

For software reconstruction of the tested algorithm session, the preferred working-evidence order is:

  1. the clinical-gated, device-local recovery ZIP containing the protected step CSV and byte-exact files for the selected Algo2015 session
  2. controlled automated evidence bundles for requirements exercised by those suites
  3. the operator record for visible UI, notification, and physical handling observations
  4. BionicScout/Dynamo and app-log records as corroborating backup, sequence correlation, and gap investigation

Scout is not required for local algorithm execution or dosing. Official study sources are Dexcom Clarity for CGM outcomes, the BionicLoop exported CSV for insulin-delivery outcomes, and staff-entered electronic CRFs for adverse events and other safety information.

The available ZIP was exported at 09:38:30 EDT on 2026-08-25. It is therefore primary local evidence only through its 09:33:48 EDT final step. Temporary Target and suspension exercises after that cutoff currently rely on the operator record plus corroborating telemetry. A post-run ZIP is required if a single local export is expected to cover those later steps.

Retained Device-Local Export

The controlled source repository retains the supporting ZIP and extracted-file hashes under the Build 843 engineering evidence record.

Artifact Size SHA-256
JRC-FORMAL-VV-algo-files-20260825-093830.zip 297,010 bytes 446914e79d535f32c646e003a8ddc639b6dde661838cfe1eced74a44f8cec409
BionicLoop_StepTelemetry.csv 99,327 bytes 77f7d00a1dd65705faf49f0bdb920a676fa499b9e756a3f10838b9aebf8a1067
BP_1787597333.txt 69,425 bytes 3fdad25b0bda38eaf993c1aaf3210497ef330e32f791c1f717a617b02fce234e
BP_LOG_1787597333.txt 118,181 bytes 52b0c2fa9952848b9816692c051a642e8cbe131cb822ec27f9a5fdab27dc5ba4
BP_ReadMatrix.m 9,589 bytes e84eec770f5d1fc2fcd4f39559b8076dcad46b3bc81c45f2e954799eb3bb4d5a

The ZIP opens, contains four nonempty files, and contains one algorithm epoch. Epoch 1787597333 is 2026-08-24 14:48:53 EDT and matches the session start. The CSV contains 222 data rows plus its header, from step 0 at 14:48:52 EDT through step 225 at 09:33:48 EDT. No unrelated algorithm session was included.

The CSV records manual BG consumption at step 7 (133 mg/dL) and step 164 (99 mg/dL). It also covers the ordinary-use, meal, relaunch, extended-CGM- outage, same-Pod fallback-recovery, and canceled-partial-meal portions performed before the export cutoff.

Deterministic Checker And Operator Correlation

The bounded checker run used signature set 0.13 and checker commit 564f912f over 2026-08-24 18:30:00Z through 2026-08-25 15:11:00Z. It reviewed 7,510 timeline events and 6,105 app-log lines, all identified as Build 843.

Exercise ID Checker result Correlated disposition
INT-01 Partial App logs are present, but the expected remote_logging_config_applied marker is absent; tool/config evidence disposition required
INT-02 Pass Readings present; no discrepancy reported
INT-03 Pass Algorithm session continued through relaunches
INT-04 Pass Meal delivery/progress cleared; commands and feedback present
INT-05 Missing by frozen signature Manual-BG submission used bg.modal.submit_button; signature 0.13 incorrectly searches for home.bg_button on the submit event. Operator and ZIP prove entry and step consumption. Preserve as an execution-tool deviation rather than changing the signature after execution.
INT-06 Pass CGM-outage guidance, reminder, backup-basal bridge, BG recovery, and resumed stepping correlated
INT-07 Not executed Conditional Pod-change exercise; no Pod change occurred in the bounded run
INT-08 Pass Four launches, same algorithm session, no step 0 or stuck meal state
INT-09 Pass Operator confirmed expected notification presentation; scheduled-notification evidence present
INT-10 Pass Short Pod signal-loss alert progression and recovery were expected
INT-11 Pass 120 mg/dL target activated, first applied, and ended early for one target identity
INT-12 Pass 130 mg/dL target applied, persisted across cold relaunch, expired, notified, and restored permanent target
INT-13 Pass Suspend/resume produced paused Home state, blocked meal, reminder, escalation, Pod-confirmed resume, and successful live step

Additional high-risk working observations:

  • a canceled 4.25 U meal delivered 0.35 U, survived force-quit/relaunch, and was consumed exactly once at the next applicable step without full-dose reconstruction or a stuck meal state
  • a long same-Pod outage reconciled 0.15 U of confirmed backup-basal delivery over bounded applicable steps and resumed live execution
  • during suspend, no pump command was sent; resume recovery recorded a verified zero delivery delta for the bounded fallback-active interval before the next live command

Limitations And Promotion Requirements

  • The working operator sheet lacks phone model/iOS and operator signature/date; this does not block its use as supporting formative evidence because no separate formal hardware-validation claim is made.
  • Pod lot/expiry and CGM identity were not captured in this record.
  • INT-07 and a same-run G7 replacement were not exercised.
  • The recovery ZIP predates the later Temporary Target and suspend/resume exercises.
  • A checker pass or operator report remains supporting evidence unless it is promoted through the study's controlled evidence process.
  • Build 843 was designated for IDE submission on 2026-09-03. This supporting evidence was accepted under D08; no separate formal hardware-validation claim is made.

Conclusion

The evidence supports use of the recovery ZIP as the primary device-local technical record for its covered session interval, with Scout telemetry as corroborating backup. The evidence closes the engineering observation that Build 843 was installed and operated with a real Pod. Sponsor evidence acceptance is recorded under D08; Build 843 was approved for IDE submission on 2026-09-03. The no-separate-formal- hardware-validation claim boundary was clinically approved on 2026-08-27.