IDE Software Technical Appendices - Manifest

Field Value
Package IDE Software Technical Appendices
Status Approved controlled technical source set; predeployment condition remains identified
Baseline ide-software-freeze-2026-08-21 / 91c0e98a9bc9429a0486bebdebffc7d8dbbe300e
Date 2026-09-08

Use of This Package

These appendices provide detailed design-control and verification support for the IDE Software Submission Core. Historical evidence narratives in a controlled source document remain audit history; current execution status is governed by the canonical RTM current-state matrix and Freeze Execution Report.

Controlled Appendices

ID Artifact Current identifier/status
A00 Enhanced Documentation Level and FDA Content Crosswalk Enhanced Documentation Level rationale and controlled FDA content map; approved under D11
A01 Software Requirements Specification SRS version 1.82; approved for IDE submission
A02 Software Design Description SDD version 1.84; frozen G7 implementation limits recorded; approved for IDE submission
A03 Risk Analysis Risk Analysis version 1.53; residual risks accepted under D07; RA-023 predeployment condition retained
A04 Software Verification and Validation Plan SVVP version 1.91; evidence accepted under D08; RA-023 coverage limits retained
A05 Requirements Traceability Matrix RTM version 1.86; canonical current 24-row mapping accepted under D08
A06 Cybersecurity Plan Cybersecurity Plan version 1.03; Build 843 dependency controls, SBOM, supportive Scout scope, and accepted cybersecurity boundary recorded
A07 Formal Evidence Index - 2026-08-21 Freeze lane index; execution complete and accepted under D08
A08 Software Composition and Dependency Inventory Manual inventory and Build 843 exact dependency evidence accepted within D09
A08A Build 843 Dependency Verification Passing engineering evidence for the installed, real-Pod-exercised Build 843 archive approved for IDE submission
A08B Build 843 SBOM and Advisory Review CycloneDX 1.5 SBOM reconciliation and dated manual license/advisory review accepted within D09
A08C IDE Cybersecurity Closure Matrix Study-used cybersecurity controls separated into complete, open, and deferred items
A09 IFU-BL-001, BionicLoop Instructions for Use Revision 1.17; approved for IDE submission 2026-09-04; supplied separately rather than embedded in the appendix compilation
A10 Software Version and Configuration Identification Frozen source, algorithm, dependency, toolchain, and document identity
A10A BionicLoop 1.0 (843) Tester Release Record Signed archive, successful distribution, installed identity, completed working real-Pod observation, CC-DEV boundary, retained-artifact locator, and 2026-09-03 IDE-submission approval
A10B Build 843 Working Hardware Evidence Review - 2026-08-25 Recovery ZIP, operator record, and corroborating telemetry reviewed as supporting evidence accepted under D08
A10C Build 843 Freeze Delta and Study-Build Designation Executable delta assessment supporting the 2026-09-03 submission-build approval
A11 IDE Freeze Execution Report - 2026-08-21 Engineering execution complete; three non-product deviations closed by controlled companion executions
A12 Post-Approval Software Change-Control and Regulatory-Classification Procedure Controlled procedure for sponsor/Regulatory approval
A13 Sponsor and Nonsoftware IDE Ownership Map Ownership/gap map; nonsoftware completion not inferred
A13A Clinical Policy Confirmation - 2026-08-21 Written confirmation of the applicable fallback and participant-weight policies; clinical policy complete
A14 Cloud Telemetry Submission-Scope Decision Supportive Scout role and official study-data/safety-report sources clinically approved 2026-08-27
A15 Protocol Fingerstick Consistency Issue Closed in the final protocol, consent, and IFU document set
A16 Clinical Approval of Software IDE Decisions - 2026-08-27 and 2026-08-31 Controlled correspondence record covering seven approved software/IDE statements, official study sources, and approval to implement all eight software-consistency recommendations
A17 Insulin Delivery CSV Data-Management and Chain-of-Custody Procedure ZIP/CSV collection, transfer, and storage approach approved 2026-09-03; detailed operating controls retained here
A18 Final Software Approvals - September 2026 Controlled correspondence approving Build 843, IFU revision 1.17, ZIP/CSV operations, RA-023 submission disposition, residual risks, verification evidence, cybersecurity scope, service environment, and final software-package approver

Formal Evidence Attachments

The formal lane directories contain checksums, commands, environment records, test outputs, and result summaries. Raw .xcresult bundles and console logs are controlled evidence attachments and are not reproduced in the narrative PDF. Working evidence is excluded from formal claims unless accepted through the sponsor-approved evidence process.

RTM Packaging Note

The external appendix compilation renders the controlled RTM's current 24-row trace linkage together with the authoritative 2026-08-21 Freeze Execution Overlay. It does not reproduce the source RTM's superseded-candidate evidence and status columns. Those fields remain unchanged in the controlled source and source-control history for internal audit use.

IFU Packaging Note

The appendix compilation does not regenerate or embed IFU screenshots. The separately controlled IFU PDF is the labeling attachment. This prevents an appendix build from silently incorporating unapproved screenshot changes.